Difference between revisions of "HS Summer2018"
From class_wiki
(→Schedule) |
(→Schedule) |
||
Line 38: | Line 38: | ||
** Rough chassis assembled | ** Rough chassis assembled | ||
** Camera on robot | ** Camera on robot | ||
− | ** Jetson powered by battery: [https://devtalk.nvidia.com/default/topic/1006369/jetson-tx2/power-requirement-for-jetson-tx2-development-board/2], [https://github.com/datlife/jetson-car/blob/master/docs/setup/README.md] | + | ** Jetson powered by battery: [https://devtalk.nvidia.com/default/topic/1006369/jetson-tx2/power-requirement-for-jetson-tx2-development-board/2], [https://github.com/datlife/jetson-car/blob/master/docs/setup/README.md]. Should definitely try the ones left over from DRC |
|- | |- | ||
|valign="top"|'''Week 4: July 9-13 -- Building''' | |valign="top"|'''Week 4: July 9-13 -- Building''' |
Revision as of 17:49, 26 June 2018
Shortened URL of this page: goo.gl/GPG8X9
Schedule
Week 1: June 18-22 -- Introduction/background | |
Week 2: June 25-29 -- Building |
|
Week 3: July 2-6 -- Building | |
Week 4: July 9-13 -- Building | |
Week 5: July 16-20 -- Teaching/learning | |
Week 6: July 23-27-- Teaching/learning | |
Week 7: July 30-August 3 -- Write-up and presentation prep |
Miscellaneous topics
- Deep neural networks
- Unity, ML-Agents
- Reinforcement learning, imitation learning
- Dynamixels
- RealSense
- Jetson
- OpenCV
- TensorFlow
- Obstacle avoidance, motion planning
- Trail following, Warthog
- C++ vs. C# vs. Java
- Linux
Parts
On hand
- Jetson TX2 dev kit
- RealSense D435 depth camera
- 4-port USB hub
- Robotis
- 5 x XL-320 servo
- Dream 2 kit (includes small rubber wheels)
- 2 x Li-ion battery LB-041, 2 x charger LBB-041
- 3 x Li-ion battery LB-040 (one more back-ordered), 2 x charger LBB-040
- 2 x OpenCM9.04C controller board
Needed
- Jetson
- Monitor, HDMI cable (expected 6/20)
- Battery
- Enclosure